Sample interview questions: Have you ever worked on a project involving the rehabilitation or upgrade of an existing hydroelectric power plant?
Sample answer:
Yes, I have extensive experience in the rehabilitation and upgrade of existing hydroelectric power plants. My responsibilities have included:
-
Assessment of existing plant conditions: I have conducted detailed inspections and assessments of existing hydroelectric facilities to identify areas for improvement and upgrade. This has included evaluating the condition of concrete structures, turbines, generators, and other critical components.
-
Development of rehabilitation and upgrade plans: I have developed comprehensive plans for the rehabilitation and upgrade of existing hydroelectric power plants. These plans have included recommendations for the repair or replacement of damaged components, the installation of new equipment, and the implementation of operational improvements.
-
Design of rehabilitation and upgrade projects: I have designed rehabilitation and upgrade projects for existing hydroelectric power plants. This has included the design of new concrete structures, the design of new turbines and generators, and the design of new electrical and mechanical systems.
-
Construction management of rehabilitation and upgrade projects: I have managed the construc… Read full answer
Source: https://hireabo.com/job/3_0_33/Hydroelectric%20Engineer